Power flow data for Polish system - winter 1999-2000 peak.
This case represents the Polish 400, 220 and 110 kV networks during winter 1999-2000 peak conditions. It is part of the 7500+ bus Europen UCTE system. To decrease the number of buses, the tie lines to foreign networks were replaced by artificial load or generator buses (180-186). Multiple generators at a bus have been aggregated. Generators that are not centrally dispatchable in the Polish energy market are given a cost of zero.
This data was graciously provided by, and is distributed with the permission of, Roman Korab (e-mail).
Licensed under the Creative Commons Attribution 4.0 International license
Field | Value |
---|---|
Publisher | |
Modified | 2018-01-25 |
Release Date | 2018-01-24 |
Identifier | e3071442-14bf-4acf-a49d-a3a64bb62f81 |
License | |
Public Access Level | Public |